FEATURED PROJECT
Holgate Feasibility
Feasibility for new wheel lathe and wash-down facility.
Requirements
A feasibility study was undertaken for Holgate depot to introduce a new facility that will house an under-floor wheel lathe machine, a bogie drop and wash-down facilities.
Our consultancy process included location optioneering for the wheel lathe facility, early stakeholder engagement, ensuring compliance with permitted development rights, integrating the wheel lathe within existing Network Rail infrastructure, checking existing power supply capacity, and planning for an external wash-down area, vehicular access road, and parking facilities.
Outcome
- All designs to Network Rail-compliant standards by the GRIP process
- GRP (ground penetrating radar) survey
- Topographical survey
- 3D survey
- Permanent way survey
- Outline drawing production
- Feasibility report
- 3D visualisation and fly through
See more projects
Oldham Column Foundations
Outline and detailed design for foundational stone columns.
Hull Botanic Gardens Superstructure
Rail depot infrastructure upgrades and structural modifications to rail shed building.