Holyhead Carriage Wash
Complete conceptual design through to detailed design for a new carriage facility.
Requirements
Our client needed a new railway carriage wash facility for their expanding rolling stock, including drainage and maintenance rail.
Our consultancy process included designing a steel portal frame shed housing a train carriage wash with a bespoke drainage system for wastewater separation to achieve recycling targets using GRP TrackPans.
The structure is designed to integrate overhead lines. The facility uses GRP TrackPans to avoid a full concrete track slab, allowing safe and efficient handback of the road after each shift. It also provides comprehensive M&E design.
Outcome
- All designs to Network Rail-compliant standards by the GRIP process
- Steel portal framed single skin cladded carriage wash shed incorporating passive provision for future overhead line
- Water reclaim plant, above ground three stage interceptor, and recycling plant for re-use.
- TrackPan integrations
- Design of GRP floor mesh
See more projects
Oldham Column Foundations
Outline and detailed design for foundational stone columns.
Hull Botanic Gardens Superstructure
Rail depot infrastructure upgrades and structural modifications to rail shed building.