Desktop Studies and Feasibility Reports

Leeds Desktop Study and Feasibility Report Hexagon Design

Overview of desktop studies

All-encompassing desktop studies and feasibility report service attuned to the exacting design project and client requirements, assessing the viability of the proposals. ​

Desktop Study Hexagon Design

What's included in our desktop study process?

Data collection

Comprehensive data collection and analysis including flood risk, UXO, gauging, signal sighting and historical record assessment

Site investigation

Site investigation visual and intrusive to assess the existing site topography, geotechnical and environmental status

Risk analysis

Identification of risks and hazards associated with the design proposals

What's included in our feasibility reports?

Technical requirements

Analysis of the desktop study findings to assess the technical engineering requirements

Environmental impact assessment

Assessment to identify any potential pollutant linkages to the development site

Noise impact assessment

Noise impact assessment of the development of the site in accordance with The Noise Policy Statement for England (NPSE), to promote good health and a good quality of life through the management of noise. Mitigation and minimising measures are documented

Ecological impact assessment

Site investigation visual and intrusive to assess the existing site topography, geotechnical and environmental status

Lightning protection analysis

Analysis of new infrastructure to protect the safety of the infrastructure and occupants via lightning strike frequency, risk analysis, identification of risk areas

Arboricultural Impact Assessment

If trees are present within the development zone an arboricultural assessment shall be required to assess the health, condition and management of trees

Breeding bird survey

In accordance with the Wildlife and Countryside Act 1981, as updated by the Countryside and Rights of Way Act 2000, if any wild birds are present or nesting surveys are conducted to identify breeding bird communities and protected species to provide information on potential impacts

Utility report

Identification of findings from utility suppliers within the area of development

Natural England Invertibrate Assessment

Post-industrial site cross seasonal sampling report to detect any species of principal importance providing an invertebrate species inventory and inform mitigation strategies

Geo-environmental assessment

Assessment of geological and geotechnical aspects of the site to fully characterise the underlying ground conditions

Transport for Wales

“HEXAGON [formally Epsilon design] provided their services for a multidiscipline project at Machynlleth train care depot, the project was trialling a new design assurance process and required extensive engagement with one of our key stakeholders. Lisa and her team [at HEXAGON] were instrumental in producing an agreed Engineering Management plan that ensured relevance compliance. The team was very professional in delivering meetings/design reviews, and the level of detail was very high. Thanks to the due diligence of this, we have collaboratively delivered a project that all stakeholders are delighted with.”

Daniel Harper, Infrastructure Project Manager

Our design process

We help companies unlock their potential
Design-Process

Check out our previous case studies

Central Rivers Wheel Lathe

Requirement for a new rail maintenance facility encompassing a steel portal frame cladded building to house a state-of-the-art double-headed wheel lathe.