Hexagon Design Consultancy was appointed to provide the design for a replacement carriage wash facility at St Philips Marsh, addressing the need to replace the
existing life-expired wash system and associated plant room equipment.
The design incorporated a new carriage wash system, an above-ground separator and new GRP access through the wash building, providing an updated facility to
support ongoing operational requirements
The design was approved, with the project successfully delivered on site to programme and within budget.
REQUIREMENTS
The replacement facility needed to match or exceed the performance of the existing system, with the design covering the following key elements: • Carriage Wash Machine – Replacement of the existing carriage wash machine with a new system. Plant Room Equipment – Replacement of the existing equipment to support the new wash facility. Control System – Installation of a new control system to operate the replacement facility. Effluent Reclaim and Water Recycling – Replacement of the existing systems to support the wash process and water recycling requirements.
“Network Rail was delighted with the new Carriage Wash”
See more projects

St Philips March Carriage Wash
Hexagon provided the full design solution for the new AVIS facility under a design-and-construct contract.
Peterborough Maintenance Hub
Hexagon provided the full design solution for the new AVIS facility under a design-and-construct contract.